We successfully completed a complex design-build shoring, excavation, and underground utility project involving the installation of cantilever and tieback shoring systems to support deep excavations in challenging site conditions. The project required close coordination between engineering, field operations, and utility installation activities to safely maintain excavation stability while protecting adjacent infrastructure and ongoing operations.

Our scope included support of excavation design and construction, mass grading and excavation, trenching, and the installation of both wet and dry utilities. Utility improvements included water, sewer, storm drain, electrical, communication, and joint utility systems integrated within a constrained construction corridor.
Through proactive planning, phased construction sequencing, and self-performed critical work scopes, the project was completed safely and efficiently while maintaining schedule and minimizing impacts to surrounding facilities and operations.
18,000 square feet of shoring, 30,000 yards of export.