ADEI crew installing a steel soldier pile with a branded RTG drill rig, with additional piles already in place.

Soldier Pile & Tieback Shoring

When neighboring buildings, a street or the property line leave no room to slope back an excavation, the cut has to go straight down. Soldier pile shoring holds that vertical excavation open so foundations, basements and below-grade work can be built safely.

ADEI drills and installs soldier pile and lagging systems, supported by tiebacks or internal bracing, to fit the excavation, the soil and the structures around it.

How Soldier Pile and Lagging Shoring Works

Overhead view of a soldier pile and lagging shoring wall holding a vertical excavation.

Steel soldier piles are installed at regular intervals around the excavation, typically in drilled holes or by vibratory installation, depending on subsurface conditions. As the soil is removed in lifts, lagging is placed between the piles to retain the exposed face. Lagging can be timber, precast concrete or steel, depending on the design.

Tiebacks or Internal Bracing

Deeper excavations usually need more than the piles alone. The wall can be supported in one of two main ways:

Tiebacks

Tiebacks are drilled and grouted anchors that tie the shoring wall back into the soil behind it. Because they work from outside the excavation, they keep the inside of the pit open for the work that follows.

Internal Bracing and Walers

Where tiebacks are not the right fit for the site, the wall can be supported from inside the excavation with steel walers, rakers and a bracing frame. ADEI used this approach on a beachfront excavation in Oceanside.

The right support system depends on the engineer of record’s design, excavation depth, soil and groundwater conditions, and what sits next to the site.

Where Excavation Shoring Is Used

  • Basements and below-grade levels for new homes and buildings
  • Beachfront and hillside lots with neighboring homes close on both sides
  • Sites where part of an existing structure has to stay in place during construction
  • Excavations below the water table, where shoring is paired with dewatering

Related Shoring Systems

Soldier piles are one of several earth retention methods ADEI installs. Depending on the site, a project may call for drilled caissons with lagging, secant pile walls for groundwater control, or sheet piling. These are covered on our Drilling, Shoring & Vibratory Installation page.

Recent Shoring Projects

Excavation Shoring, Oceanside

Tight beachfront excavation in Oceanside with an ADEI crane working around neighboring homes and the portion of the existing house that had to remain.

Drilled steel soldier piles with timber lagging, an internal steel bracing frame with walers, and dewatering for a new beachfront home. The braced system allowed a vertical excavation while protecting the houses on either side and the portion of the existing structure that had to remain, under groundwater levels that fluctuated with the tides.

Beachside Shoring & Landslide Repair, Malibu

Drilled caissons, shotcrete and wood lagging formed the shoring for a large new home on the beach, letting excavation move forward between neighboring oceanfront homes on a site where access was limited.

Shoring on Tight Sites

Many shoring jobs sit between existing homes or next to the beach, with little room for equipment. Our Limited-Access Drilling capabilities, including crane support from the street when needed, help get piles in where space is limited.

Excavation Shoring or Slope Stabilization?

Shoring supports a planned excavation. If the problem is a hillside or bluff that is moving or eroding, that is slope stabilization work, which ADEI typically handles with shear pins, gradebeams and tiebacks. Learn more about our Slope Stabilization & Earth Retention services.

One Point of Contact From Design to Construction

ADEI can build from your engineered plans or take the shoring through our Design-Build Solutions, giving the project team one point of contact for engineering and installation and room for value engineering early on.

Planning an Excavation?

Send us your plans or geotechnical report, and we will review the excavation, site access and shoring options with your team. Request a project review.